海軍艦艇

海鯤級潛艦(國造潛艦)

臺灣的國造潛艦計畫——一項格外雄心勃勃的工業工程,其戰略價值在分析人士之間確實存在爭議。

Hai Kun 臺灣 Programme launched 2016; prototype launched 2023 and undergoing sea trials through 2026.

狀態截至
2026-09
最後檢視
2026-09-27

評估低信心

提供辨識背景,而非性能數據表。本目錄涵蓋與Vigil所關注之衝突相關的主要公開記載系統——並非詳盡的戰鬥序列。不記錄任何數量、可用狀況或當前配置。

紀錄 此系統是什麼、源自何處、由誰使用,以及與Vigil的哪些模組相關——並附上每一項所依據的證據。

原型 · 未經實戰核實 Evidence: Unverified
剪影 · 未按比例

紀錄

系列Hai Kun
衍生型IDS; Narwhal
原產地臺灣
製造商CSBC Corporation
年代Programme launched 2016; prototype launched 2023 and undergoing sea trials through 2026.
出現於臺灣海峽

衝突關聯性

這是本目錄中此系統的唯一紀錄。它與下方的模組相關;各模組的Force Atlas會顯示它在該處的使用方式。

使用方

Taiwan (Republic of China): Prototype in sea trials; not an in-service capability

戰場角色

Intended for sea denial in the waters and approaches around Taiwan.

優勢

Submarines are among the hardest platforms to find and neutralise, and building them domestically after decades of being unable to buy them is a substantial industrial achievement with real deterrent signalling value.

限制

The programme is slow, expensive and unproven: the prototype has been conducting sea trials rather than entering service, and schedules have moved repeatedly. Critics within the asymmetric-defence school argue the cost would buy far more denial capability in missiles, mines and small craft. Vigil records the trials as reported milestones and makes no claim about capability, timeline or fleet size.

與戰役的關聯

推導所得:這些戰役中的一個參與組織,與此系統有一筆具類型的裝備關聯。這並不等同於有文件記錄該系統在戰役本身中的使用。

外觀識別

A conventional diesel-electric submarine with an X-form stern rudder arrangement — four angled control surfaces rather than the cruciform layout of the older boats Taiwan operates — and a slender sail set well forward. The X-stern is the distinguishing feature and is visible only out of the water.

有文件記錄的衝突使用

Launched in September 2023 and engaged in harbour and sea trials since, with delivery repeatedly rescheduled; the boat has not entered operational service. It left on its 21st sea trial, the 15th with submerged testing, on 21 September 2026, having missed the November 2025 delivery deadline its builder attributed to testing delays. Follow-on hulls are funded in Taiwan's special defence budgets and are the subject of continuing legislative argument. Vigil records trials and budget decisions as reported milestones and makes no claim about capability, timeline or eventual fleet size — this is the record in the Taiwanese catalogue where the gap between programme announcement and delivered capability is widest, and the confidence grade says so.

軍種與兵種使用方

Reported & historical formation associations

評估截至 — 2026-09 最近檢視 — 2026-09-27