Der Eintrag Was dieses System ist, woher es stammt, wer es betreibt und für welche Module von Vigil es relevant ist — mit den Belegen, auf denen jede dieser Angaben beruht.
Eintrag
Relevanz für Konflikte
Dies ist der einzige Eintrag des Katalogs zu diesem System. Es ist für das unten genannte Modul relevant; der Force Atlas jedes Moduls zeigt, wie es dort eingesetzt wird.
Betreiber
Taiwan (Republic of China): Prototype in sea trials; not an in-service capability
Rolle auf dem Gefechtsfeld
Intended for sea denial in the waters and approaches around Taiwan.
Stärken
Submarines are among the hardest platforms to find and neutralise, and building them domestically after decades of being unable to buy them is a substantial industrial achievement with real deterrent signalling value.
Einschränkungen
The programme is slow, expensive and unproven: the prototype has been conducting sea trials rather than entering service, and schedules have moved repeatedly. Critics within the asymmetric-defence school argue the cost would buy far more denial capability in missiles, mines and small craft. Vigil records the trials as reported milestones and makes no claim about capability, timeline or fleet size.
Relevanz für Kampagnen
Abgeleitet: Eine beteiligte Organisation dieser Kampagnen hat eine typisierte Ausrüstungszuordnung zu diesem System. Das ist nicht dasselbe wie ein dokumentierter Einsatz des Systems in der Kampagne selbst.
- Anhaltender Druck unterhalb der Schwelle Verstärkt seit 2020
via ROC Navy (Prospective, moderate confidence)
- Maritime Zwangsunterbindung — von der Quarantäne zur Blockade Eingeschätzter Eventualfall
via ROC Navy (Prospective, moderate confidence)
Visuelle Erkennung
A conventional diesel-electric submarine with an X-form stern rudder arrangement — four angled control surfaces rather than the cruciform layout of the older boats Taiwan operates — and a slender sail set well forward. The X-stern is the distinguishing feature and is visible only out of the water.
Dokumentierter Einsatz im Konflikt
Launched in September 2023 and engaged in harbour and sea trials since, with delivery repeatedly rescheduled; the boat has not entered operational service. It left on its 21st sea trial, the 15th with submerged testing, on 21 September 2026, having missed the November 2025 delivery deadline its builder attributed to testing delays. Follow-on hulls are funded in Taiwan's special defence budgets and are the subject of continuing legislative argument. Vigil records trials and budget decisions as reported milestones and makes no claim about capability, timeline or eventual fleet size — this is the record in the Taiwanese catalogue where the gap between programme announcement and delivered capability is widest, and the confidence grade says so.
Betreibende Teilstreitkräfte und Dienste
- ROC Navy Prospective
Reported & historical formation associations
- ROC Navy Fleet Command Prospective · moderate confidence
Programme in trials; not an in-service capability claim.
Eingeschätzt zum Stand — 2026-09 Zuletzt überprüft — 2026-09-27