本頁部分內容仍以英文正本呈現:相關譯文尚未完成。 英文版本

海軍艦艇

閩江級快速布雷艦

小型專用布雷艦——中華民國海軍的第一批,也是臺灣整個裝備清單中對拒止戰略最直接的體現。

Min Jiang class 臺灣 First four commissioned January 2022; a further six contracted from April 2025.

狀態截至
2026-09
最後檢視
2026-09-09

評估高信心

提供辨識背景,而非性能數據表。本目錄涵蓋與Vigil所關注之衝突相關的主要公開記載系統——並非詳盡的戰鬥序列。不記錄任何數量、可用狀況或當前配置。

紀錄 此系統是什麼、源自何處、由誰使用,以及與Vigil的哪些模組相關——並附上每一項所依據的證據。

服役 證據:有文件記錄
剪影 · 未按比例

紀錄

系列Min Jiang class
衍生型Min Jiang-class rapid minelaying boat
原產地臺灣
製造商Lungteh Shipbuilding
年代First four commissioned January 2022; a further six contracted from April 2025.
出現於臺灣海峽

衝突關聯性

這是本目錄中此系統的唯一紀錄。它與下方的模組相關;各模組的Force Atlas會顯示它在該處的使用方式。

戰場角色

Rapid mining of coastal approaches. Mines are the cheapest way to make water expensive to cross, and a small automated minelayer is the cheapest way to put them there quickly. The role is counter-amphibious in the most direct sense available to a defender.

優勢

Domestically designed and built, so the programme depends on no foreign export decision. The vessels are small, individually inexpensive and numerous enough to be lost without losing the capability — which is the asymmetric argument applied to shipbuilding rather than to missiles. Automated laying gear compresses the time a vessel is exposed. The Navy is contracted to roughly double the class by the end of 2026.

限制

Mining is a capability with a demanding precondition: it has to be done before or during the thing it is meant to stop, in water the other side is contesting, by small lightly armed vessels. Specialist analysis of Taiwan's mine warfare argues the gap between the published concept and the demonstrated capability remains substantial — a purpose-built minelayer force is a necessary component and not the same thing as an ability to lay a barrier under fire. Stockpiles of the mines themselves, and the doctrine and legal process for authorising their use, are not public and are not estimated here.

與戰役的關聯

推導所得:這些戰役中的一個參與組織,與此系統有一筆具類型的裝備關聯。這並不等同於有文件記錄該系統在戰役本身中的使用。

外觀識別

A very small warship of a few hundred tonnes with a low, flat quarterdeck running almost to the waterline — the working deck the laying gear discharges from — and a light gun forward. The proportions are closer to a fast patrol boat than to a conventional naval auxiliary.

有文件記錄的衝突使用

Four vessels were commissioned in January 2022 as the Navy's first purpose-built minelayers. In March 2025 the Navy sought a contractor for six more, and in April 2025 awarded the contract, with all six to be completed by the end of December 2026 — bringing the class to ten. The programme has been presented by Taiwan's defence ministry as part of its area-denial development and appears in its 2025 defence reporting on that basis.

軍種與兵種使用方

有文件記錄的部隊

評估截至 — 2026-09 最近檢視 — 2026-09-09