What this organisation is
Saudi Aramco operates the kingdom's production, the Abqaiq processing complex, the Ras Tanura terminal on the Gulf and the East–West (Petroline) system that carries crude across the peninsula to Yanbu on the Red Sea. The Petroline carries a roughly 7 million b/d emergency ceiling established in 2019 — never a demonstrated sustained rate — and Aramco announced a ramp to full capacity on 10–11 March 2026. Wartime handling at Yanbu is estimated commercially at about 3 million b/d, of which roughly 2 million goes to Aramco's own Red Sea refineries before export crude can load, and an Iranian drone strike in April 2026 temporarily disabled about 700,000 b/d of it. Every alternative to Hormuz combined is estimated at 3.5 to 5.5 million b/d against a normal strait volume of about 20 million: a capacity comparison, not a measurement of what moved.
The organisation whose system is the module's central bypass number — and the reason that number is a ceiling, not a flow.
Confiance : modérée Au 2026-08Revu le 2026-10-03
Official name: Saudi Arabian Oil Company
Published facilities
Each is a marker the module already publishes; the relationship is this record’s own claim, with its own grade and source.
- Ras TanuraPort
- AbqaiqCentre industriel
- Corridor de l’oléoduc est–ouest (Petroline)Corridor · artère d’approvisionnement et d’échanges
The East–West pipeline system; the 2019 emergency ceiling is Aramco's own figure.
- YanbuPort
- JazanRaffinerie
Every claim on this record is an announcement or a target. Nothing here is recorded as commissioned or delivered.
A ramp of the East–West system to full capacity, announced 10–11 March 2026, against a roughly 7 million b/d emergency ceiling established in 2019 that was never a demonstrated sustained rate.
Systems it belongs to
Supply systems it runs on
Commodities and outputs
Pétrole brut et produits raffinés
Owners, controllers and arrangements
Ce qui reste inconnu
- No published sustained throughput for the East–West system under wartime conditions was read; the module carries the ceiling and the commercial estimate of Yanbu handling, labelled as such.
Évalué au — 2026-08 Dernière revue — 2026-10-03