VIGIL CONSILIUM
Kontext statt Schlagzeilen.
Teile dieser Seite erscheinen in der kanonischen englischen Fassung; ihre Übersetzung liegt noch nicht vor. Englische Fassung

Mining economy · partial record

Gold and uranium

Mali's gold belt — roughly 80 per cent of exports and the state's indispensable revenue — and Niger's uranium district, the asset at the centre of the state's dispute with its operator and a tribunal.

4 published markers 1 supply system 2 operators

Eingeschätzt zum Stand
2026-08
Zuletzt überprüft
2026-10-03

EinschätzungMittlere Konfidenz

Context, not targeting. A system record names published markers and published operators and states dependencies at the level a published institution does. It carries no facility-level capacity, vulnerability, protection or repair detail; the schema has no field for any of it.

Übersichtskarte — Landumriss aus Natural Earth 110m (gemeinfrei); 4 Orte, die dieser Eintrag nennt, an den Koordinaten, die das Modul bereits veröffentlicht. Es sind keine Routen, Grenzen, Kontrolle oder Aktivität eingezeichnet.

Was dieses System ist

Gold is roughly 80 per cent of Mali's exports, concentrated in the western belt around Kayes and Kéniéba, and the junta has squeezed the sector hard; Niger's uranium at Arlit passed to state operational control in December 2024 and was declared nationalised in June 2025. Both are fiscal bases under pressure.

The fiscal base of two of the three AES states, and the arena in which the juntas' terms with foreign operators are being set.

Konfidenz: mittel Stand 2026-08Überprüft am 2026-10-03

Das System

Überblick
In Mali, a 2023 mining code raising the state's take was followed by a two-year confrontation with Barrick over the Loulo–Gounkoto complex — provisional administration, an ICSID arbitration, and a settlement in November 2025 in which the company paid roughly US$430m in total, withdrew its claims and accepted the code in exchange for a ten-year permit extension and restored operational control, regained on 18 December 2025. In Niger, Orano halted output at Arlit in October 2024, the mine passed to Nigerien operational control in December 2024, nationalisation was announced in June 2025, and an ICSID tribunal has ordered Niger not to sell the stockpiled uranium pending Orano's claims — an order the state has said on television it intends to disregard. The signal to foreign operators across the Sahel is the module's reading of both.
Current state · as of 2026-08
Mali: Loulo–Gounkoto restarted at the end of 2025, permit renewed in February 2026, 2026 guidance of 260,000 to 290,000 attributable ounces. Niger: the uranium dispute unresolved and conducted in public, as of August 2026.
Commodities and outputs
Gold

Knoten

The published markers that carry this system value, by the module’s own priority. A note is the system record’s; a marker without one is a member by its own tag.

Routes and operators

Supply systems running through it

  • Malis Korridore für TreibstoffimporteFuel imports · 6 nodes · 5 documented disruptions · joined by its nodesDrei Landrouten decken den gesamten Treibstoffbedarf eines Binnenstaates — und seit September 2025 sind sie Ziel einer erklärten Blockade.

Organisations that run it

  • BarrickMining company · ActiveThe operator of Loulo–Gounkoto, the largest industrial gold complex in Mali's western belt, which regained operational control in December 2025 after a two-year confrontation with the state.
  • SOMAÏRMining company · Status uncertainThe operator of the Arlit uranium mine — 63.4 per cent Orano, 36.6 per cent the state's SOPAMIN on paper, under Nigerien operational control since December 2024 and declared nationalised in June 2025.

Dependencies and constraints

Each marked documented (a published source states it) or assessed (Vigil infers it and says so). The two are never drawn the same way.

Jüngste strukturelle Änderungen

Übertragungsketten durch dieses System

Each step carries its own basis grade — Confirmed, Plausible exposure, Unconfirmed scenario — and a chain can only weaken from left to right.

Was unbekannt bleibt

  • No 2026 produced-ounce figure against guidance was read; Arlit output since the 2024 halt is not published in a form the module has read.

In Erkunden öffnen Interaktiv: Wählen Sie diesen Eintrag aus und verfolgen Sie, was mit ihm verbunden ist.

Eingeschätzt zum Stand — 2026-08 Zuletzt überprüft — 2026-10-03