Energy system · partial record

Dépendance énergétique et interconnexion

The cross-border electricity and gas links the flank runs on — the grid the Baltic states joined in 2025, the interconnectors damaged in the Gulf of Finland, and Moldova's westward interface.

1 published marker 1 supply system

Évalué au
2025-06
Dernière revue
2026-11-08

ÉvaluationConfiance modérée

Contexte, pas ciblage. Une fiche de système nomme des repères publiés et des exploitants publiés et indique les dépendances au niveau où une institution publiée le fait. Elle ne comporte aucun détail sur la capacité, la vulnérabilité, la protection ou la réparation au niveau des installations ; le schéma n’a de champ pour aucun d’eux.

Locator — land outline from Natural Earth 110m (public domain); 1 place this record names, at the coordinates the module already publishes. No routes, boundaries, control or activity are drawn.

Ce qu’est ce système

The flank's energy system is a set of cross-border links. The Baltic states left the Russian-led BRELL grid for the Continental European one in February 2025, and two Gulf of Finland interconnectors were damaged and repaired in 2023–25. The record dates both; it maps no cable or pipeline.

Explains why undersea damage in the Baltic is a defence subject in this module: the links that carry the region's power and gas are few, cross-border and in shared waters, and the synchronisation of 2025 ended the Baltic grid's operational dependence on Russia.

Confiance : modérée Au 2025-06Revu le 2026-11-08

Le système

Vue d’ensemble
On 8 February 2025 Estonia, Latvia and Lithuania disconnected from the BRELL power ring they had shared with Russia and Belarus, and on 9 February they synchronised with the Continental European grid through the Lithuania–Poland link. Under the Gulf of Finland, the Balticconnector gas pipeline was damaged in October 2023 and returned to commercial use on 22 April 2024, and the Estlink 2 power cable was damaged on 25 December 2024 and returned to commercial use in June 2025. Further south, Moldova's electricity system connects westward through the interface with Romania.
Current state · as of 2025-06
Both damaged interconnectors were back in commercial use by June 2025; the Baltic grid has run synchronised with Continental Europe since February 2025. No outage, capacity or flow figure is carried.
Commodities and outputs
Natural gas and crude oil · Electricity interconnection

Nœuds

The published markers that carry this system value, by the module’s own priority. A note is the system record’s; a marker without one is a member by its own tag.

Routes and operators

Supply systems running through it

  • La liaison maritime balteGeneral trade · 9 nodes · 3 documented disruptions · named by the recordUne mer à une seule entrée, et la raison pour laquelle les moitiés nord et sud de ce théâtre sont reliées.

Dependencies and constraints

Each marked documented (a published source states it) or assessed (Vigil infers it and says so). The two are never drawn the same way.

ContrainteDocumenté Confiance : élevée

The record names dependencies and never locates, sizes or rates the vulnerability of a cable, pipeline or interconnector.

Sources : Official government statements

Changements structurels récents

Chaînes de transmission passant par ce système

Each step carries its own basis grade — Confirmed, Plausible exposure, Unconfirmed scenario — and a chain can only weaken from left to right.

Ce qui reste inconnu

  • The status of the other Baltic links (NordBalt, LitPol, the planned Harmony Link) after 2025 was not verified by this pass.

Ouvrir dans Explorer Interactif : sélectionnez cette fiche et suivez ce qui s’y rattache.

Évalué au — 2025-06 Dernière revue — 2026-11-08